South Line (Survival 3)

From Dogcraft Wiki

(past tense)
Tag: Visual edit
m (Minor past tense corrections)
Tag: Visual edit
Line 1: Line 1:
The South Line of the [[Survival Railway Network (Survival 3)|SRN]] leaded South from [[Spawn (Survival 3)|Spawn]] and [[Grand Central Station (Survival 3)|Grand Central Station]], connecting in order to South, Coconut, Snowman, Barrier, Neon, Tower, and Luxor Stations. The long-term goal for the line was to connect to South Border Station, with stations situated approximately every 1500 blocks apart.
The South Line of the [[Survival Railway Network (Survival 3)|SRN]] led South from [[Spawn (Survival 3)|Spawn]] and [[Grand Central Station (Survival 3)|Grand Central Station]], connecting in order to South, Coconut, Snowman, Barrier, Neon, Tower, and Luxor Stations. The long-term goal for the line was to connect to South Border Station, with stations situated approximately every 1500 blocks apart.


South Line was the only SRN line to have had two managers. [[User:Marbou9|Marbou9]] oversaw the construction of the line all the way to Snowman Station before handing the baton over to [[User:Mrs Diss|Mrs_Diss]], who finished construction of Snowman Station and brought the line all the way to Luxor Station. Construction of additional tracks and stations was an ongoing project.
South Line was the only SRN line to have had two managers. [[User:Marbou9|Marbou9]] oversaw the construction of the line all the way to Snowman Station before handing the baton over to [[User:Mrs Diss|Mrs_Diss]], who finished construction of Snowman Station and brought the line all the way to Luxor Station. Construction of additional tracks and stations was an ongoing project.
Line 17: Line 17:
''Main article: [[South Border Station (Survival 3)]]''
''Main article: [[South Border Station (Survival 3)]]''


Built by [[User:Brogaman|Brogaman]] and rising like a netherbrick tree out of the ocean, South Border Station was the ultimate destination of the South Line. At time of writing it is still separated from the rail line by over 12000 blocks, but it represents the scale and ambition of the SRN project.
Built by [[User:Brogaman|Brogaman]] and rising like a netherbrick tree out of the ocean, South Border Station was the ultimate destination of the South Line. It was separated from the rail line by over 12000 blocks, but it represented the scale and ambition of the SRN project.


{{Navbox Survival 3}}
{{Navbox Survival 3}}

Revision as of 13:34, 19 May 2020

The South Line of the SRN led South from Spawn and Grand Central Station, connecting in order to South, Coconut, Snowman, Barrier, Neon, Tower, and Luxor Stations. The long-term goal for the line was to connect to South Border Station, with stations situated approximately every 1500 blocks apart.

South Line was the only SRN line to have had two managers. Marbou9 oversaw the construction of the line all the way to Snowman Station before handing the baton over to Mrs_Diss, who finished construction of Snowman Station and brought the line all the way to Luxor Station. Construction of additional tracks and stations was an ongoing project.

South Line Stations

South Border Station

Main article: South Border Station (Survival 3)

Built by Brogaman and rising like a netherbrick tree out of the ocean, South Border Station was the ultimate destination of the South Line. It was separated from the rail line by over 12000 blocks, but it represented the scale and ambition of the SRN project.

This page was last modified on 19 May 2020, at 13:34. (2 years ago)