Survival Railway Network (Survival 3)
Project
TypeTransportation Project
This is about the network on Survival 3. For the wider organisation, click here.

Template:Key people templateThe Survival 3 Railway Network is a network of railways across the Survival 3 world with the mission of providing a high quality rail transport network using four main SRN lines that begin at Grand Central Station in Spawn and extend in each cardinal direction.

Survival 3 World

SRN management was approached in late mid to late 2018 and was given the opportunity to build Survival 3 Spawn, with the view of Grand Central Station being a main component. The offer was accepted and work begun therefrom, finishing on the 19th of October.

Focus on building the first four cardinal stations at the end of pre-built lines began at Survival 3 opening.

Nether Transport Network

A pre-built NTN and indeed server nether hub was made before the Survival 3 world launched. A nether portal to the hub was built within the Spawn Basin, a welcome occurrence given the awkward nature of previous NTN Hub portal locations.

NTN tunnel design features ice, with an open tunnel and station layout. This was a departure from the original packed ice and dual lane system used in Survival 1 and 2. A main reason for the design revision was to improve ease of travel to destinations not within a NTN station.

Stations

Main Station

North Line

East Line

  • East Station
  • Tidal Station
  • Cool Cove Station

South Line

  • South Station
  • Coconut Station
  • Snowman Station

West Line

  • West Station
  • Mall Station
  • Balaton Station