Shoreline Station

From Dogcraft Wiki

imported>DarparnioxDC
No edit summary
(change to branchlines)
Tag: Visual edit
 
(11 intermediate revisions by 6 users not shown)
Line 1: Line 1:
{{Infobox_Station|title1 = Shoreline Station|location = x: -8, z: -2431|network(s) = SRN, NTN|line = North Line|builder = darparniox|opened = 9ᵗʰ January 2019|main_lines = 2|secondary_lines = 1|image1 = 2019-03-06 20.28.32.png}}'''Shoreline Station''' is the second station of the North line of the Survival 3 [[Survival Railway Network|SRN]] and follows on from North Station. Predictably, the station is situated on the shore of a large ocean, which is not bridged until the site of the third northern station, Witchwood Station.
{{Infobox Station
|title        =  
|image        = 2019-03-06 20.28.32.png
|caption      =
|world        = Survival 3
|line         = North Line
|builders    = {{Player|darparniox}}
|opened       = 9ᵗʰ January 2019
|xcoord      = -8
|ycoord      = 64
|zcoord      = -2431
|mainlines    = 2
|branchlines=1}}


== Design ==
'''Shoreline Station''' was the second station of the North line of the Survival 3 [[Survival Railway Network|SRN]] and followed on from [[North Station (Survival 3)|North Station]]. Predictably, the station was situated on the shore of a large ocean, which was not bridged until the site of the third northern station, [[Witchwood Station]]. {{TransportDiagram North Line (Survival 3)}}
Shoreline Station features two platforms, both topped with large slanted roofs. These platforms are used for SRN lines and branch lines, respectively. A large tower adorns the East side of the station, and houses a NTN portal and can be used to access the roof for elytra flight.  


Sandstone and wood variants are the main materials used, with prismarine as an accent.
==Design==
Shoreline Station featured two platforms, both topped with large, slanted roofs. These platforms were used for SRN lines and branch lines, respectively. A large tower adorned the East side of the station housing a NTN portal and it could be used to access the roof for elytra flight.  


== History ==
Sandstone and wood variants were the main materials used with prismarine as an accent.
The rail line toward Shoreline Station from North Station was completed in a single day. This quick expansion left the North Line in a advanced state, and therefore other tasks were given priority over the station construction.  


Nevertheless, Shoreline Station was the earliest second stop to be completed in early January 2019. Two weeks later, a branch line to Dragon Valley was built and connected to the station, albeit among some confusion as to the correct platform for it.
==History==
[[Category:SRN]]
The rail line toward Shoreline Station from North Station was completed in a single day. This quick expansion left the North Line in an advanced state, and therefore other tasks were given priority over the station construction.
 
Nevertheless, Shoreline Station was the earliest second stop to be completed in early January 2019. Two weeks later, a branch line to [[Dragon Valley]] was built and connected to the station.
 
{{Navbox Survival 3}}
[[Category:Survival 3]]
[[Category:Survival 3]]
__NOTOC__
__NOEDITSECTION__
[[Category:Stations]]

Latest revision as of 18:29, 14 September 2023

Shoreline Station
Survival 3
2019-03-06 20.28.32.png
Station
WorldSurvival 3
NetworkSurvival Railway Network (Survival 3)
LineNorth Line
Opened9ᵗʰ January 2019
Builder(s)20.png darparniox
LocationX= -8
Y= 64
Z= -2431
ConnectionsMain-line connections2 Branch connections1


Shoreline Station was the second station of the North line of the Survival 3 SRN and followed on from North Station. Predictably, the station was situated on the shore of a large ocean, which was not bridged until the site of the third northern station, Witchwood Station.


Design

Shoreline Station featured two platforms, both topped with large, slanted roofs. These platforms were used for SRN lines and branch lines, respectively. A large tower adorned the East side of the station housing a NTN portal and it could be used to access the roof for elytra flight.

Sandstone and wood variants were the main materials used with prismarine as an accent.

History

The rail line toward Shoreline Station from North Station was completed in a single day. This quick expansion left the North Line in an advanced state, and therefore other tasks were given priority over the station construction.

Nevertheless, Shoreline Station was the earliest second stop to be completed in early January 2019. Two weeks later, a branch line to Dragon Valley was built and connected to the station.

Background Valentine's Day Event 2024 by TheWhiteTigerNL