East Border Station

From Dogcraft Wiki

imported>Brogaman
mNo edit summary
(Past Tense)
Tag: Visual edit
 
(7 intermediate revisions by 2 users not shown)
Line 1: Line 1:
{{Infobox Build
{{Infobox Station
|title       = {{ROOTPAGENAME}}
|title           = East Border Station
|image       = Dogcraft_Red_Cog_Logo.png
|image           =  
|caption     = Add a caption for your image!
|caption         =  
|world       = [[Survival 3]]
|world           = Survival 3
|builders    = {{REVISIONUSER}}
|network          =  
|contributors =  
|line            = East Line
|status      = {{Active}}
|builders        = {{Player|Broga_}} & many others
|completed    =  
|opened          = 27<sup>th</sup> December 2019
|xcoord       =  
|xcoord           = 0
|ycoord       =  
|ycoord           = 0
|zcoord       =  
|zcoord           = 30000
|dimension    = Overworld
|mainlines        = ''none''
}}
|sur3_branchlines =  
}}{{Quote|Oooh-- Oh my.. Oh my god.. I--.. Oh my god! Holy mackrel!|{{Player|William278}}, reacting to being shown the station for the first time.}}


'''{{ROOTPAGENAME}}''' is a build on the [[Survival 3]] world of the [[Dogcraft Server]].
'''East Border Station''', also known as '''Cool Beans Station''' was the final destination of the East Line on the [[Survival 3]] world of the [[Dogcraft Server]]. Though the station was not connected to the [[Survival Railway Network (Survival 3)|Survival Railway Network]], it served as the overworld counterpart to the final stop on the Nether Transport Network.


==About==
==About==
This station was built for William278 as his and the SRN 2019Xmas Gift. The station designing was conceived and executed by Broga_. This stations lore and Design stems from never ending Cool-Beans rivalry within the SRN team, There’s a long story their folks I’m sure there a wiki article on it.  
This station was built for East Line manager William278 as a present for Christmas 2019. The station designing was conceived and executed by Broga_. This stations lore and Design stemmed from never ending Cool-Beans rivalry within the SRN team. The station included a hidden cool-bean village, with 8 hidden rooms with lore about cool-beans kind. The station was accessible through a nether portal in William278's head.  


<br />
==History==
==History==
Construction began 12/18/19 and ended 12/26/19 just one day after Xmas celebrations. The build team was led by Broga_. The builders were Skyhook2415, SummerFlower1234, Riot_of_Peguins, Huilgrin, Dutchsoccer, Princess223, Blueartistic813, Mulluslime, Ragecage295 and Scooberson. To date this is the largest SRN station on survival 3. “We had many laughs and gags on this I assure you.” Broga_
Construction began 12/18/19 and ended 12/26/19 just one day after Xmas celebrations. The build team was led by Broga_. The builders were Skyhook2415, SummerFlower1234, Riot_of_Peguins, Huilgrin, Dutchsoccer, Princess223, blueartistic813_, Molluslime, Ragecage295 and Scooberson. It was one of the largest [[Survival Railway Network (Survival 3)|Survival Railway Network]] stations on Survival 3. The station was shown to William278 the following day after completion and [https://www.youtube.com/watch?v=V6wGM-AWzMk his reaction was recorded].


<br />
{{Navbox Survival 3}}
==Gallery==
__NOEDITSECTION__
Add some photos of your build!
 
==Features==
Features of this station are that well designed hidden cool-bean village, 8 hidden rooms with lore about cool-beans kind. And being able to go into line manger william278 head. To view the reaction to Williams gift fallow this link. https://www.youtube.com/watch?v=V6wGM-AWzMk
 
Also known as Cool-bean Station.

Latest revision as of 13:39, 19 May 2020

East Border Station
Survival 3
Station
WorldSurvival 3
NetworkSurvival Railway Network (Survival 3)
LineEast Line
Opened27th December 2019
Builder(s)20.png Broga_ & many others
LocationX= 0
Y= 0
Z= 30000
ConnectionsMain-line connectionsnone 

"Oooh-- Oh my.. Oh my god.. I--.. Oh my god! Holy mackrel!" 20.png William278, reacting to being shown the station for the first time.

East Border Station, also known as Cool Beans Station was the final destination of the East Line on the Survival 3 world of the Dogcraft Server. Though the station was not connected to the Survival Railway Network, it served as the overworld counterpart to the final stop on the Nether Transport Network.

About

This station was built for East Line manager William278 as a present for Christmas 2019. The station designing was conceived and executed by Broga_. This stations lore and Design stemmed from never ending Cool-Beans rivalry within the SRN team. The station included a hidden cool-bean village, with 8 hidden rooms with lore about cool-beans kind. The station was accessible through a nether portal in William278's head.

History

Construction began 12/18/19 and ended 12/26/19 just one day after Xmas celebrations. The build team was led by Broga_. The builders were Skyhook2415, SummerFlower1234, Riot_of_Peguins, Huilgrin, Dutchsoccer, Princess223, blueartistic813_, Molluslime, Ragecage295 and Scooberson. It was one of the largest Survival Railway Network stations on Survival 3. The station was shown to William278 the following day after completion and his reaction was recorded.