East Border Station

From Dogcraft Wiki

imported>William
No edit summary
No edit summary
Line 21: Line 21:


==History==
==History==
Construction began 12/18/19 and ended 12/26/19 just one day after Xmas celebrations. The build team was led by Broga_. The builders were Skyhook2415, SummerFlower1234, Riot_of_Peguins, Huilgrin, Dutchsoccer, Princess223, Blueartistic813, Mulluslime, Ragecage295 and Scooberson. To date this is the largest [[Survival Railway Network (Survival 3)|Survival Railway Network]] station on Survival 3. The station was shown to William278 the following day after completion and [https://www.youtube.com/watch?v=V6wGM-AWzMk his reaction was recorded].
Construction began 12/18/19 and ended 12/26/19 just one day after Xmas celebrations. The build team was led by Broga_. The builders were Skyhook2415, SummerFlower1234, Riot_of_Peguins, Huilgrin, Dutchsoccer, Princess223, blueartistic813_, Mulluslime, Ragecage295 and Scooberson. To date this is the largest [[Survival Railway Network (Survival 3)|Survival Railway Network]] station on Survival 3. The station was shown to William278 the following day after completion and [https://www.youtube.com/watch?v=V6wGM-AWzMk his reaction was recorded].


{{Navbox Survival 3}}
{{Navbox Survival 3}}
__NOEDITSECTION__
__NOEDITSECTION__

Revision as of 17:31, 16 April 2020

East Border Station
Survival 3
Station
WorldSurvival 3
NetworkSurvival Railway Network (Survival 3)
LineEast Line
Opened27th December 2019
Builder(s)20.png Broga_ & many others
LocationX= 0
Y= 0
Z= 30000
ConnectionsMain-line connectionsnone 

"Oooh-- Oh my.. Oh my god.. I--.. Oh my god! Holy mackrel!" 20.png William278, reacting to being shown the station for the first time.

East Border Station, also known as Cool Beans Station is the final destination of the East Line on the Survival 3 world of the Dogcraft Server. Though the station is currently not connected to the Survival Railway Network, it serves as the overworld counterpart to the final stop on the Nether Transport Network.

About

This station was built for East Line manager William278 as a present for christmas 2019. The station designing was conceived and executed by Broga_. This stations lore and Design stems from never ending Cool-Beans rivalry within the SRN team. The station includes a hidden cool-bean village, with 8 hidden rooms with lore about cool-beans kind. The station is accessible through a nether portal in William278's head.

History

Construction began 12/18/19 and ended 12/26/19 just one day after Xmas celebrations. The build team was led by Broga_. The builders were Skyhook2415, SummerFlower1234, Riot_of_Peguins, Huilgrin, Dutchsoccer, Princess223, blueartistic813_, Mulluslime, Ragecage295 and Scooberson. To date this is the largest Survival Railway Network station on Survival 3. The station was shown to William278 the following day after completion and his reaction was recorded.

This page was last modified on 16 April 2020, at 17:31. (4 years ago)