(Created page with "{{Infobox Station|world=Survival 5|subworld=Shepherd|image=FSInfobox.png|caption=Forgesmith shortly before opening.|network=Survival Railway Network (Survival 5)|line=Shepherd South Line|opened=9th April 2023|builders={{Player|AdamB4255}}|xcoord=240|zcoord=3425|ntnconnection=Shepherd South Tunnel|mainlines=1|branchlines=0}} '''Forgesmith Station''' is the second station on the Shepherd South Line on Survival 5. The station was designed and build by {{Player|AdamB425...")
Tag: Visual edit
ย 
No edit summary
Line 27: Line 27:
[[Category:Builds]]
[[Category:Builds]]
[[Category:Survival 5]]
[[Category:Survival 5]]
{{Navbox Survival 5}}

Revision as of 13:41, 12 September 2023

Forgesmith Station
Survival 5 Shepherd
FSInfobox.png
Forgesmith shortly before opening.
Station
WorldSurvival 5 (Shepherd)
NetworkSurvival Railway Network (Survival 5)
LineShepherd South Line
Opened9th April 2023
Builder(s)20.png AdamB4255
LocationX= 240
Z= 3425
NTN ConnectionShepherd South Tunnel
ConnectionsMain-line connections1 Branch connections0


Forgesmith Station is the second station on the Shepherd South Line on Survival 5. The station was designed and build by 20.png AdamB4255, while the construction of the line connecting the station was managed by 20.png Montenator. The station will also feature as part of the future Shepherd Ring Line, with hopeful future connections heading east and west, as well as south. The station was opened to the public on the 9th of April 2023, after a line building session was held the day prior to complete the line connecting it to Shepherd South Station.

About The Station

Looking to build another SRN station, AdamB4255 approached Montenator looking for a potential area to build one. At this point the Shepherd South Line was significantly underdeveloped compared to the other SRN main lines, but had recently started making progress again as 20.png Ze_Tais began finishing South Station. To get the line properly back on track the plot of land for South 2 was offered up to AdamB4255, and he quickly got to work creating a design for the station.


The area in question was a fairly blank canvas, being a beach at the edge of a forest. Forgesmith Station is designed to resemble a semi-industrial printing studio, with decorative machines that operate inside the station. The main station building is clean and functional and built mainly out of brick and granite with stripped oak as the framework. Copper and warped wood are used as an accent for the windows, and sandstone makes up the gently curved roof. The most striking feature of the station is the small smoke stack that towers above the rest of the building, in a similar fashion to Reservoir Station on Akita.


Another small building with a similar block palette is located nearby, that features more beds and NTN access, as well as a small Monty Coffee stall. A small seating area is located just outside this building, overlooking the ocean to the southwest. Further decoration in the area involved two delivery trucks dropping of supplies to the factory, as well as old crates strewn about the area. A few dirt paths interlink the two main buildings, with another heading down to the beach that is lined with a few palm tress and a pond housing several blue axolotls. The station is also connected to the RHN via a road built by 20.png starr274.


Gallery

This page was last modified on 12 September 2023, at 13:41. (9 months ago)