Reservoir Station

From Dogcraft Wiki

mNo edit summary
Tag: Visual edit
m (Text replacement - "TheWhiteTigerNL" to "TigerNL")
 
(7 intermediate revisions by 2 users not shown)
Line 11: Line 11:
|mainlines    = 2   
|mainlines    = 2   
|network= Survival Railway Network (Survival 5)|branchlines=4}}
|network= Survival Railway Network (Survival 5)|branchlines=4}}
{{TransportDiagram East Line (Akita)}}
<blockquote>Dear reader, I wish I could tell you that I made this all up: but an entire town was lost to a bottle of water.
<blockquote>Dear reader, I wish I could tell you that I made this all up: but an entire town was lost to a bottle of water.
<br/>
<br/>
''-Excerpt from a traveler's journal''</blockquote>
''-Excerpt from a traveler's journal''</blockquote>


{{TransportDiagram East Line (Akita)}}


'''Reservoir Station''' is the second station on the Akita East Line on the [[Survival 5]] world of the [[Dogcraft Server]]. The station was designed and built by Akita East Line manager, {{Player|eybwam}}. It was unfolded on the 4th of February 2023, during a Mega Opening event, alongside Donkey Station, Temple Station, Two Lakes Station, and Shepherd South Station. Reservoir will serve the '''Akita Ring Line'''.  
'''Reservoir Station''' was the second station on the Akita East Line on the [[Survival 5]] world of the [[Dogcraft Server]]. The station was designed and built by Akita East Line manager, {{Player|eybwam}}. It was unfolded on the 4th of February 2023, during a Mega Opening event, alongside Donkey Station, Temple Station, Two Lakes Station, and Shepherd South Station. Reservoir served the '''Akita Ring Line'''.


A drastically different building designed during the waning end of [[Survival 4]] was originally slated by ''eybwam'' to be constructed for Akita's second East Station. However, the initial concept proved to be incompatible with the surveyed location and future plans for the ''Ring Line—''a chain of railways encircling Akita's spawn area, intersecting the four cardinal lines on their second main stations.    
==Design==
A drastically different building designed during the waning end of [[Survival 4]] was originally slated by ''eybwam'' to be constructed for Akita's second East Station. However, the initial concept proved to be incompatible with the surveyed location and future plans for the ''Ring Line—''a chain of railways encircling Akita's spawn area, intersecting the four cardinal lines on their second main stations.<gallery mode="nolines" widths="250" perrow="2" caption="Aerial, long shot views of the station">
File:ReservoirSV1.png
File:ReservoirSV2.png
</gallery>


==Design==
Assuming an industrial complex design, Reservoir drew hints of inspiration from a point of interest constructed by {{Player|Slomo_1994}} on a section of line between [[Hub Station]] and [[Meridian Station]] on [[Survival 4]] (coordinates: x: 8180, z: -415).
Assuming an industrial complex design, Reservoir draws hints of inspiration from a point of interest constructed by {{Player|Slomo_1994}} on a section of line between [[Hub Station]] and [[Meridian Station]] on [[Survival 4]] (coordinates: x: 8180, z: -415).  
[[File:ReservoirNA.png|left|thumb|297x297px|The felled water tower can be discerned behind the signboard.]]
Reservoir prominently featured an old, brick-laden factory building on a sprawling and overgrown lot, that heralded the building's past. Some of the original pieces of machinery were left intact or otherwise refurbished. A felled and derelict water tower was spotted on the south end of the site. Moreover, two giant steel tanks stood scatheless on the north end.
 
Inside, the factory building was retrofitted to provide all ancillary features: with crafting tables, ender chests, stonecutters, among others. Network maps were posted onto the sides of crates on pallets. On the floor was a map of the surrounding area. Beds were shelved onto storage racks. Recessed into its eastern wall was a portal for [[Nether Transport Network|NTN]] connection. Elytra platforms were set up atop two chimneys towering over the site, and were accessed via bubble elevators on both sides of the portal.
[[File:ReservoirRHN.png|left|thumb|''Reservoir's RHN stables can accommodate up to 24 horses.'']]
Forklifts built by {{Player|TigerNL}} were added to what was once the factory's loading bays''—''now converted into stables for the [[Road and Horse Network|RHN]].
[[File:ReservoirFV.png|thumb|''Front view of the CSC port with the straddle carrier on the righthand side.'']]
A covered walkway connected the factory building to the [[Connected Seas Coalition|CSC]] port. The port assumed the silhouette of a dry bulk storage bay usually seen at construction sites. A branch of [[Monty Coffee]] was requested to serve the stop. Four boat dispensers found on the docks below were utilized to navigate the lake and river. Adjacent the port was a straddle carrier that propped up a watercraft designed by ''eybwam''. The port, however, never saw an official opening.


Reservoir prominently features an old, brick-laden factory building on a sprawling and overgrown lot, heralding the building's past. Some of the original pieces of machinery were left intact or otherwise refurbished. A felled and derelict water tower can be spotted on the south end of the site. Moreover, two giant steel tanks are stand scatheless on the north end.


Inside, the factory building was retrofitted to provide all ancillary features: with crafting tables, ender chests, stonecutters, among others. Network maps were posted onto the sides of crates on pallets. On the floor was a map of the surrounding area. Beds were shelved onto storage racks. Recessed into its eastern wall was a portal for [[Nether Transport Network|NTN]] connection. Elytra platforms were set up atop two chimneys towering over the site, and were accessed via bubble elevators on both sides of the portal. Forklifts built by {{Player|TheWhiteTigerNL}} were added to what was once the factory's loading bays''—''now converted into stables for the [[Road and Horse Network|RHN]]. A covered walkway connected the factory building to the [[Connected Seas Coalition|CSC]] port. A branch of [[Monty Coffee]] was requested to serve the stop. Four boat dispensers found on the docks below can be utilized to navigate the lake and river. Adjacent the port was a straddle carrier that propped up a watercraft designed by ''eybwam''.  
The Station served two main line connections: one eastbound towards East 3, and westbound to [[Ember Perch Station]]. Additionally, the station had provisions for an additional 4 branch or ring line connections.


The Station serves two main line connections: one eastbound towards East 3, and westbound to [[Ember Perch Station]]. Additionally, the station has provisions for an additional 4 branch or ring line connections.
== Line Opening Video ==
Below is footage of the opening of Reservoir Station, as part of a mega opening hosted by all the Line Managers.


<br />
{{Video|1=https://www.youtube.com/watch?v=mqY6ECddkA0&list=PL8ZTn4iaMjwHhnxtqol45VxCgXKFq1ArB&index=34&t=6607s}}{{Navbox Survival 5}}
{{Navbox Survival 5}}

Latest revision as of 01:53, 25 February 2024

Reservoir Station
Survival 5
Reservoir Station.png
Station
WorldSurvival 5
NetworkSurvival Railway Network (Survival 5)
LineAkita East Line
Opened4th February 2023
Builder(s)20.png eybwam
LocationX= 3020
Z= -152
ConnectionsMain-line connections2 Branch connections4


Akita East-Line
TIcon SRN TRK NS.png
TIcon Blank.png
TIcon SRB ITC NS.png
Sunbeam Station
TIcon SRN TRK NS.png
TIcon SRB TRK NS.png
TIcon SRB ITC NS.png
Northeast Station
Highland Heights
TIcon SRN TRK NS.png
TIcon SRB ITC N.png
TIcon SRB TRK NS.png
TIcon SRN TRK NS.png
TIcon Blank.png
TIcon SRB ITC NS.png
Greencoast Station
TIcon Blank.png
TIcon SRB TRK NS.png
TIcon SRB ITC NS.png
Bookmark Station
Birch Junction
TIcon Blank.png
TIcon SRB ITC NS.png
TIcon SRB TRK NS.png
mrkalaspuff
TIcon Blank.png
TIcon SRB ITC N.png
TIcon SRB TRK NS.png
TIcon Blank.png
TIcon Blank.png
TIcon SRB ITC NS.png
Fire Forge Station
TIcon Blank.png
TIcon Blank.png
TIcon SRB ITC NS.png
Southeast Station

Dear reader, I wish I could tell you that I made this all up: but an entire town was lost to a bottle of water.


-Excerpt from a traveler's journal


Reservoir Station was the second station on the Akita East Line on the Survival 5 world of the Dogcraft Server. The station was designed and built by Akita East Line manager, 20.png eybwam. It was unfolded on the 4th of February 2023, during a Mega Opening event, alongside Donkey Station, Temple Station, Two Lakes Station, and Shepherd South Station. Reservoir served the Akita Ring Line.

Design

A drastically different building designed during the waning end of Survival 4 was originally slated by eybwam to be constructed for Akita's second East Station. However, the initial concept proved to be incompatible with the surveyed location and future plans for the Ring Line—a chain of railways encircling Akita's spawn area, intersecting the four cardinal lines on their second main stations.

Assuming an industrial complex design, Reservoir drew hints of inspiration from a point of interest constructed by 20.png Slomo_1994 on a section of line between Hub Station and Meridian Station on Survival 4 (coordinates: x: 8180, z: -415).

The felled water tower can be discerned behind the signboard.

Reservoir prominently featured an old, brick-laden factory building on a sprawling and overgrown lot, that heralded the building's past. Some of the original pieces of machinery were left intact or otherwise refurbished. A felled and derelict water tower was spotted on the south end of the site. Moreover, two giant steel tanks stood scatheless on the north end.

Inside, the factory building was retrofitted to provide all ancillary features: with crafting tables, ender chests, stonecutters, among others. Network maps were posted onto the sides of crates on pallets. On the floor was a map of the surrounding area. Beds were shelved onto storage racks. Recessed into its eastern wall was a portal for NTN connection. Elytra platforms were set up atop two chimneys towering over the site, and were accessed via bubble elevators on both sides of the portal.

Reservoir's RHN stables can accommodate up to 24 horses.

Forklifts built by 20.png TigerNL were added to what was once the factory's loading baysnow converted into stables for the RHN.

Front view of the CSC port with the straddle carrier on the righthand side.

A covered walkway connected the factory building to the CSC port. The port assumed the silhouette of a dry bulk storage bay usually seen at construction sites. A branch of Monty Coffee was requested to serve the stop. Four boat dispensers found on the docks below were utilized to navigate the lake and river. Adjacent the port was a straddle carrier that propped up a watercraft designed by eybwam. The port, however, never saw an official opening.


The Station served two main line connections: one eastbound towards East 3, and westbound to Ember Perch Station. Additionally, the station had provisions for an additional 4 branch or ring line connections.

Line Opening Video

Below is footage of the opening of Reservoir Station, as part of a mega opening hosted by all the Line Managers.