South Station (Shepherd)
From Dogcraft Wiki
Darparniox (talk | contribs) (link to monty coffee) |
(new infobox transport owoah) Tag: Visual edit |
||
Line 1: | Line 1: | ||
{{Infobox | {{Infobox Transport|adjoiningseas=Shepherd Spawn Sea|adjoiningwaterways=TBD|branchlines=4|builders={{Player|Aeghu}} & {{Player|Ze_Tais}}|caption=Main view of the station|image=Shepherd South Main View.png|mainlines=2|networkport=[[Connected Seas Coalition|Connected Seas Coalition]]|networkshelter=[[Road and Horse Network|Road and Horse Network]]|ntnconnection=Shepherd South Tunnel|opened=4th February 2023|sur4subworld=Shepherd|world=Survival 5}} | ||
'''South station''' is the first station on the Shepherd South Line on [[Survival 5]] world. The station was first started by former Line Manager {{Player|Aeghu}}, but to be taken later by {{Player|Ze_Tais}} to finish the station. The station took around a year to be fully constructed, but would see great progress around the end of 2022, and the start of 2023. The station was opened on the 4th of February among four other stations. | '''South station''' is the first station on the Shepherd South Line on [[Survival 5]] world. The station was first started by former Line Manager {{Player|Aeghu}}, but to be taken later by {{Player|Ze_Tais}} to finish the station. The station took around a year to be fully constructed, but would see great progress around the end of 2022, and the start of 2023. The station was opened on the 4th of February among four other stations. | ||
Line 8: | Line 8: | ||
== History == | == History == | ||
{{TransportDiagram South Line (Shepherd)}} | |||
After a few successful build sessions, the line going from Grand Central Station (GCS) to South station would see the completion. (See List for builders in the table below, and gallery). The line would pass by the [[Road and Horse Network|RHN]] Shepherd Headquarters, and {{Player|HatterSkye}}'s desert base. | After a few successful build sessions, the line going from Grand Central Station (GCS) to South station would see the completion. (See List for builders in the table below, and gallery). The line would pass by the [[Road and Horse Network|RHN]] Shepherd Headquarters, and {{Player|HatterSkye}}'s desert base. | ||
Line 13: | Line 14: | ||
The station would also have a frog statue, build by {{Player|NeoFiore}}, which represents the 1.19 update. | The station would also have a frog statue, build by {{Player|NeoFiore}}, which represents the 1.19 update. | ||
{| class="wikitable mw-collapsible" | {| class="wikitable mw-collapsible" | ||
|+ | |+ |
Revision as of 17:14, 10 February 2023
South Station (Shepherd) | |
---|---|
Survival 5 Shepherd | |
Transport | |
World | Survival 5 (Shepherd) |
Opened | 4th February 2023 |
Builder(s) | Aeghu & Ze_Tais |
NTN Connection | Shepherd South Tunnel |
Station | |
Network | Survival Railway Network (Survival 5) |
Connections | 2 4 |
Shelter | |
Network | Road and Horse Network |
Port | |
Network | Connected Seas Coalition |
Adjoining Seas | Shepherd Spawn Sea |
Adjoining Waterways | TBD |
South station is the first station on the Shepherd South Line on Survival 5 world. The station was first started by former Line Manager Aeghu, but to be taken later by Ze_Tais to finish the station. The station took around a year to be fully constructed, but would see great progress around the end of 2022, and the start of 2023. The station was opened on the 4th of February among four other stations.
About
The station saw great progress withingthe first few months when Survival 5 started, but to be left without any progress for a lot of months till November 2022, where Ze_Tais would take on the task of finishing South station. The main structure was mainly constructed by Aeghu, but would only see slight modifications for the middle part. Being the addition of new pillars, and more support for the roof. The interior would be designed by the players TheWhiteTigerNL, Montenator, and Ze_Tais. TheWhiteTigerNL would construct the RHN room, and Montenator would construct the Monty Café.
History
After a few successful build sessions, the line going from Grand Central Station (GCS) to South station would see the completion. (See List for builders in the table below, and gallery). The line would pass by the RHN Shepherd Headquarters, and HatterSkye's desert base.
The station would see major changes to the surroundings with more foliage added, and a few terraforming.
The station would also have a frog statue, build by NeoFiore, which represents the 1.19 update.
# | BUILDERS OF THE RAILWAY & STATION |
---|---|
1 | Aeghu |
2 | Ze_Tais |
3 | Montenator |
4 | Slomo_1994 |
5 | HatterSkye |
6 | Mika_Panda |
7 | Maple39 |
8 | bucherwurm31 |
9 | XPmodder |
10 | PeakMars |
11 | D_nub |
12 | Nonium |
13 | Neofiore |
14 | MrManatee13 |
15 | Elednor89 |
16 | Wanderer_06 |
17 | Valeritas |
18 | AwesomeTom21 |
19 | 5milesmile |
20 | strawberrysham |
21 | _Maddy_monster |
22 | tinjybricks |
23 | AdamB4255 |
24 | TheWhiteTigerNL |
Connections
South Station contains connections with the NTN, RHN and a future CSC port. The NTN portal would be built by the Shepherd World Manager AwesomeTom21, while the RHN shelter would be built by PeakMars. A CSC port has been in the works, and to have an opening very soon!
Gallery
Here is some photos during the building process of the station!
|