South Station (Shepherd)
From Dogcraft Wiki
(Made Past Tense) Tag: Visual edit |
Montenator (talk | contribs) No edit summary Tag: Visual edit |
||
Line 103: | Line 103: | ||
File:SHEP SOUTH 1 (1).png|RHN room, which is build by TheWhiteTigerNL. Functions as the homeroom in front of the shelters built by PeakMars. | File:SHEP SOUTH 1 (1).png|RHN room, which is build by TheWhiteTigerNL. Functions as the homeroom in front of the shelters built by PeakMars. | ||
</gallery> | </gallery> | ||
{{Navbox Survival 5}} | ย | ||
== Line Opening Video == | |||
Below is footage of the opening of South Station, as part of a mega opening hosted by all the Line Managers. | |||
ย | |||
{{Video|1=https://www.youtube.com/watch?v=mqY6ECddkA0&list=PL8ZTn4iaMjwHhnxtqol45VxCgXKFq1ArB&index=34&t=6607s}}{{Navbox Survival 5}} |
Revision as of 19:32, 24 January 2024
South Station (Shepherd) | |
---|---|
Survival 5 Shepherd | |
Transport | |
World | Survival 5 (Shepherd) |
Opened | 4th February 2023 |
Builder(s) | Aeghu & Ze_Tais |
NTN Connection | Shepherd South Tunnel |
Station | |
Network | Survival Railway Network (Survival 5) |
Connections | 2 4 |
Shelter | |
Network | Road and Horse Network |
Roads | Shepherd Turnpike Southern Highway |
Port | |
Network | Connected Seas Coalition |
Adjoining Seas | Shepherd Spawn Sea |
Adjoining Waterways | TBD |
South station was the first station on the Shepherd South Line on Survival 5 world. The station was first started by former Line Manager Aeghu, but to be taken later by Ze_Tais to finish the station. The station took around a year to be fully constructed, but would see great progress around the end of 2022, and the start of 2023. The station was opened on the 4th of February among four other stations.
About
The station saw great progress within the first few months when Survival 5 started, but was left without any progress for a lot of months until November 2022 when Ze_Tais would take on the task of finishing South station. The main structure was mainly constructed by Aeghu, but only saw slight modifications for the middle part. Being the addition of new pillars, and more support for the roof. The interior was designed by TheWhiteTigerNL, Montenator, and Ze_Tais. TheWhiteTigerNL constructed the RHN room, and Montenator constructed the Monty Cafรฉ.
History
After a few successful build sessions, the line going from Grand Central Station (GCS) to South station saw completion. (See List for builders in the table below, and gallery). The line passed by the RHN Shepherd Headquarters, and HatterSkye's desert base.
The station saw major changes to the surroundings with more foliage added and a few terraforming. The station also had a frog statue, built by NeoFiore, which represented the 1.19 update.
# | BUILDERS OF THE RAILWAY & STATION |
---|---|
1 | Aeghu |
2 | Ze_Tais |
3 | Montenator |
4 | Slomo_1994 |
5 | HatterSkye |
6 | Mika_Panda |
7 | Maple39 |
8 | bucherwurm31 |
9 | XPmodder |
10 | PeakMars |
11 | D_nub |
12 | Nonium |
13 | Neofiore |
14 | MrManatee13 |
15 | Elednor89 |
16 | Wanderer_06 |
17 | Valeritas |
18 | AwesomeTom21 |
19 | 5milesmile |
20 | strawberrysham |
21 | _Maddy_monster |
22 | tinjybricks |
23 | AdamB4255 |
24 | TheWhiteTigerNL |
Connections
South Station contained connections with the NTN, RHN and a future CSC port. The NTN portal was built by the Shepherd World Manager AwesomeTom21, while the RHN shelter was built by PeakMars. A CSC port had been in the works, but was never opened.
Gallery
Here is some photos during the building process of the station!
Line Opening Video
Below is footage of the opening of South Station, as part of a mega opening hosted by all the Line Managers.
|