Spawn Port (Retriever)

From Dogcraft Wiki

(Created page with "{{Infobox Port|image=RSPInfobox.png|caption=The Port from its main entrance.|network=Connected Seas Coalition|world=Survival 6|subworld=Retriever|builders={{Player|Montenator}} {{Player|H_Di_Chemici}}|contributors={{Player|XPModder}} {{Player|Edhellan}}|opened=1st January 2024|xcoord=-235|zcoord=40|dimension=Overworld|ntnconnection=Served by Spawn|adjoiningseas=Northern Sea|adjoiningwaterways=Squid Bay Canal}} '''{{{{{|safesubst:}}}ROOTPAGENAME}}''' is a build on th...")
Tag: Visual edit
ย 
(A bit more progress!)
Tag: Visual edit
ย 
Line 8: Line 8:
Will complete article soon!
Will complete article soon!


==About==
==About The Port==
Write about your build, describe what it is!
The port is located in a plains biome north of the main Spawn basin on Retriever. Currently it sits across the road, opposite from [[Spawn Shelter (Retriever)|Spawn]] [[Spawn Shelter (Retriever)|Shelter]] for the Retriever [[Road and Horse Network|RHN]]. The port surprisingly is not built near any body of water, and it in fact is elevated some 50 blocks above the water level, due to the nature of the terrain. To combat this, a custom built pool was built outside the canal, two canals connect to this pool, one bound for the north and the other for the east (not yet constructed). The north canal travels through a tunnel underneath a small hill before breaking out on the surface again and descending into a natural cave via a ladder system. The ladder system is designed to be as simplistic as possible, with bubble-vators raising boats up a level every 6 blocks. Eventually the ladder descends into an aquafer within the cave, before another small tunnel takes the player through to Squid Bay, which has access to the wider rivers and seas of the server.
ย 
The port was designed in October 2023, in anticipation for an imminent release of Survival 6. The design work was postponed when it was revealed Survival 6 would still be some time away, and was revisited in early December 2023 by ''Montenator'' and ''H_Di_Chemici'' who, along with ''XPModder'', would finalise the design for the port.


==History==
==History==

Latest revision as of 10:35, 6 January 2024

Spawn Port (Retriever)
Survival 6 Retriever
RSPInfobox.png
The Port from its main entrance.
Port
WorldSurvival 6 (Retriever)
NetworkConnected Seas Coalition
Builder(s)20.png Montenator 20.png H_Di_Chemici
Contributors20.png XPModder 20.png Edhellan
Opened1st January 2024
LocationX= -235
Z= 40
NTN ConnectionServed by Spawn
Adjoining Sea(s)Northern Sea
Adjoining Waterway(s)Squid Bay Canal

Spawn Port (Retriever) is a build on the Survival 6, Retriever world of the Dogcraft Server. It was designed by 20.png Montenator and its interior by 20.png H_Di_Chemici. 20.png XPModder would also assist with aspects of the design, while 20.png Edhellan would assist Montenator and H_Di_Chemici with the ports construction in game. It would open to the public on New Year's Day 2024 and was the first transport network opening of Survival 6.


Will complete article soon!

About The Port

The port is located in a plains biome north of the main Spawn basin on Retriever. Currently it sits across the road, opposite from Spawn Shelter for the Retriever RHN. The port surprisingly is not built near any body of water, and it in fact is elevated some 50 blocks above the water level, due to the nature of the terrain. To combat this, a custom built pool was built outside the canal, two canals connect to this pool, one bound for the north and the other for the east (not yet constructed). The north canal travels through a tunnel underneath a small hill before breaking out on the surface again and descending into a natural cave via a ladder system. The ladder system is designed to be as simplistic as possible, with bubble-vators raising boats up a level every 6 blocks. Eventually the ladder descends into an aquafer within the cave, before another small tunnel takes the player through to Squid Bay, which has access to the wider rivers and seas of the server.

The port was designed in October 2023, in anticipation for an imminent release of Survival 6. The design work was postponed when it was revealed Survival 6 would still be some time away, and was revisited in early December 2023 by Montenator and H_Di_Chemici who, along with XPModder, would finalise the design for the port.

History

Write about the history of your build

Gallery

Add some photos of your build!

[Other Info]

Add your own heading here, or change the headings above to suit your builds needs!

Background Dragon Slayer - Retriever by Ironboundred