CRN HQ

From Dogcraft Wiki

Revision as of 15:54, 18 March 2023 by Xpmodder (talk | contribs) (Page created!)
(diff) โ† Older revision | Latest revision (diff) | Newer revision โ†’ (diff)
CRN HQ
Survival 5 Labrador
Transport
WorldSurvival 5 (Labrador)
OpenedWill open on March 18th, 2023
Builder(s)20.png XPModder
LocationX= -75
Z= 1915
NTN ConnectionLab South Tunnel
Station
NetworkCommunity Rail Network
LineLabrador South
ConnectionsMain-line connections2 
Port
NetworkConnected Seas Coalition
Adjoining Waterways2 Unnamed Rivers



The CRN-Headquarters are located on the south line of the CRN on the Labrador world of Survival 5. The CRN-HQ also functions as the first station on the South Line on Labrador. The HQ also incorporates a CSC Port, which is located under ground inside the hill that the HQ sits on top of.

History

The location for the South Station was first found by 20.png Tankkiler123 in August of 2022 and he later also confirmed, that this station would also incorporate the CRN HQ. After some time with little work being done on the project, the construction of most of the line connecting it to spawn, was taken over by 20.png XPModder at the end of september. Most of the line was constructed by november. This also included the CRN's first causeway, which traverses a lake not far from the station.

During this time, 20.png Tankkiler123 was working on some designs for the station and HQ in a creative world. Due to lack of time on his behalf, the progress was slow and eventually came to a halt.

For some months, no further progress would be made and at the beginning of march 2023 20.png Tankkiler123 asked 20.png XPModder to take over the project, as he did not have enough time, to work on multiple big projects at once any more.

After taking over the project and taking a look at the location, 20.png XPModder decided, that a design he had worked on before, would work well for the location and was also very large, thus also working well as a HQ, as it could easily house the additionally required facilities. This design only required a few modifications, before being ready for use as the CRN HQ.

After making some modifications to the design and officially announcing the change in the projects leadership, XPModder soon began terraforming and marking out the location of the station.

It was not long until the construction of the station would begin. The station and HQ, as well as the port were largely done by the end of the second week of march. The project was constructed so fast, as XPModder had been anticipating the construction and eventual opening of the CRN HQ for a while and he also had, at the time, no other big projects he was working on and thus, put all his time on the server into this project. Additionally he had done some scouting for the eventual location for the second south station on Labrador and had found it to be located at the location of the official easter event, which was at the time, under construction by the DCT. This discovery lead to the proposal of a combined effort of the entire CRN to build, not only the CRN HQ, but also the next south line, connecting the HQ to the easter event area.

After this large amount of progress in such a short time, the opening of the HQ was announced by XPModder, to take place on march 18th, 2023. In this opening, not only the HQ and the line connecting it to spawn, but also Olton Hall Station, the second station on the North line on Labrador and the line connecting it to North Station would be opened.

Labrador South-Line
TIcon CRN ITC S.png
TIcon SRB CNT N.png
Labrador Ring Line
TIcon CRN ITC NS.png
TIcon SRB CNT S.png
Labrador Ring Line
To be continued
TIcon CRN CNT S.png
TIcon Blank.png
This page was last modified on 18 March 2023, at 15:54. (7 months ago)