Grand Central Station (Labrador)

From Dogcraft Wiki

Labrador Grand Central Station
Survival 5 Labrador
GCS Labrador.png
Station
WorldSurvival 5 (Labrador)
NetworkCRN
LineNorth, East, South and West
OpenedMarch 18th 2022 / August 26th 2022
Builder(s)20.png Skelleton123
LocationX= 60
Z= -100
ConnectionsMain-line connections4 


The Grand Central Station on Labrador was the big rail station located at Labrador Spawn, just left of the spawn building. It was the origin of the Community Rail Networks 4 mainlines on Labrador. From here the main lines went in all four cardinal directions to the other stations.

The station was built with the rest of the spawn area and was part of the protected spawn region.

The interior of the station underwent multiple changes during the Survival 5 season. These included changes to the map area to make space for the network map, rewriting of the entire sign board to inform about the CRN, as well as the inclusion of banners to indicate which direction each line was going, as all lines leave the station in the same direction and only later turn to the direction they are heading.

The station has two opening dates, as it was technically useable from the very start of the Labrador world on the 18th of March 2022, but the first line and first station to connect to it would only open on the 26th of August, thus marking the first time the station could be used as a starting point or destination of a rail journey.

The first line to connect to the station was the North line, heading to North Station and was build in a build session, led by 20.png XPModder. As mentioned above, this line would open on the 26th of August 2022.

The second line to be connected to the station was the South line, connecting to the CRN HQ and was also built by XPModder. This line was opened on the 18th of March 2023, by pure coincidence exactly one year after the launch of Survival 5.

The East and West lines were built later, as both the first stations in these directions saw little to no progress in a very long time. The first East station was eventually taken over by 20.png ItsDaCreeper, who after finishing the station also built the line connecting it to Grand Central Station. The line and station are set to be opened on the 23rd of September 2023.

The west line was eventually constructed by XPModder, after 20.png N1cM4tth3w63, the builder of the first west station Wild West had given the project of building the line over to him. Tragically due to the absence of N1c from the server and the community at large, this line was never opened and at the point of writing this, it is still unclear if the line will ever open.

Labrador North-Line
TIcon CRN ITC NS.png
TIcon SRB CNT N.png
Labrador Ring Line
TIcon CRN ITC NS.png
TIcon SRB CNT S.png
Labrador Ring Line
To be continued
TIcon CRN CNT S.png
TIcon Blank.png
Labrador East-Line
TIcon CRN ITC NS.png
TIcon SRB CNT N.png
Labrador Ring Line
TIcon CRN ITC NS.png
TIcon SRB CNT S.png
Labrador Ring Line
To be continued
TIcon CRN CNT S.png
TIcon Blank.png
Labrador South-Line
TIcon CRN ITC S.png
TIcon SRB CNT N.png
Labrador Ring Line
TIcon CRN ITC NS.png
TIcon SRB CNT S.png
Labrador Ring Line
To be continued
TIcon CRN CNT S.png
TIcon Blank.png
Labrador West-Line
Wild West
TIcon CRN ITC NS.png
TIcon Blank.png
TIcon SRB CNT N.png
Labrador Ring Line
Bifurcation
TIcon CRN ITC NS EC.png
TIcon ORM ITC S EWC.png
TIcon SRB ITC NS WC.png
To be continued
TIcon CRN CNT S.png
TIcon ORM CNT S.png
TIcon SRB TRK NS.png
LabraDepths Subway
TIcon Blank.png
TIcon Blank.png
TIcon SRB CNT S.png
Labrador Ring Line