North Station (Akita)

From Dogcraft Wiki

No edit summary
(pictures)
Line 1: Line 1:
{{Infobox Station
{{Infobox Station
|titleĀ  Ā  Ā  Ā  = North Station
|titleĀ  Ā  Ā  Ā  = North Station
|imageĀ  Ā  Ā  Ā  = Ā 
|imageĀ  Ā  Ā  Ā  = N5A Hillside.png
|captionĀ  Ā  Ā  = Ā 
|captionĀ  Ā  Ā  = Ā 
|worldĀ  Ā  Ā  Ā  = Survival 5
|worldĀ  Ā  Ā  Ā  = Survival 5
Line 28: Line 28:


==Gallery==
==Gallery==
gimme a sec
<gallery>
File:N5A Cliffside.png
File:N5A Interior.png
File:N5A Opening.png
</gallery><br />

Revision as of 11:56, 11 October 2022

North Station
Survival 5
N5A Hillside.png
Station
WorldSurvival 5
NetworkSurvival Railway Network (Survival 5)
LineSRN North Line (Akita)
Opened19th September 2022
Builder(s)Template:Darparniox
ConnectionsMain-line connections2 
Map
  Lua error in Module:ServerMap at line 83: attempt to concatenate upvalue 'zCoord' (a nil value).
  



North Station is a station on the Survival 5 world of the Dogcraft Server. Situated around 800 blocks north of the Akita Spawn Island, North Station is the first stop on the Survival Railway Network's North Line of Akita.

About

The station is located at the first coastline north of Spawn in order to provide the quickest possible stop for travelers simply seeking land. In a jungle biome, the station is straightforward in layout, a wide main platform for SRN lines and an NTN portal on the hillside and branch line terminals on the coastside. Down a staircase is an exit by foot area, and further down built into the cliff wall is a Connected Seas Coalition port. The station palette is predominantly wooden with some stone and sandstone.

History

The station site was set up on the 18th of March, the first day of Survival 5, in anticipation that the absence of homes would result in more players basing near to Spawn. On the 11th of April, a bridge across the ocean was built by a team of around 10 players that connected Spawn to the northern continent and the North Station site. However, it is not until late June that the main platform was designed by 20.png darparniox and built with help from 20.png Ze_Tais and 20.png starr274 and the station functional in rail and NTN terms.


Because of a planned absence from the server on the part of North Line Manager 20.png darparniox, progress on the station stalled entirely until late August. The branch lines and port areas were completed in time for an opening on the 19th of September.

Gallery


This page was last modified on 11 October 2022, at 11:56. (9 months ago)
Background Valentine's Day Event 2024 by TheWhiteTigerNL