North Station (Akita)

From Dogcraft Wiki

Revision as of 09:49, 11 October 2022 by Darparniox (talk | contribs) (Created page with "{{Infobox Station |title = {{ROOTPAGENAME}} |image = Dogcraft_Red_Cog_Logo.png |caption = Add a caption for your image! |world = Survival 4 |line...")
(diff) โ† Older revision | Latest revision (diff) | Newer revision โ†’ (diff)
North Station (Akita)
Survival 4
Dogcraft Red Cog Logo.png
Add a caption for your image!
Station
WorldSurvival 4
NetworkSurvival 4 Railway Network
Connections 
Map
  Click for full map
  
  https://map.dogcraft.net/maps/sheltie/tiles/1/xExpression error: Unexpected / operator./zExpression error: Unexpected / operator..png
  <div id="marker-wrapper" style="

left: calc( Expression error: Unexpected < operator.% - 30px); top: calc( Expression error: Unexpected < operator.% - 70px); >

    



North Station is a station on the Survival 5 world of the Dogcraft Server. Situated around 800 blocks north of the Akita Spawn Island, North Station is the first stop on the North Line of Akita.

About

The station is located at the first coastline north of Spawn in order to provide the quickest possible stop for travelers simply seeking land. In a jungle biome, the station is straightforward in layout, a wide main platform for SRN lines and an NTN portal on the hillside and branch line terminals on the coastside. Down a staircase is an exit by foot area, and further down built into the cliff wall is a Connected Seas Coalition port. The station palette is predominantly wooden with some stone and sandstone.

History

The station site was set up on the 18th of March, the first day of Survival 5, in anticipation that the absence of homes would result in more players basing near to Spawn. On the 11th of April, a bridge across the ocean was built by a team of around 10 players that connected Spawn to the northern continent and the North Station site. However, it is not until late June that the main platform was built and the station functional in rail and NTN terms.


Because of a planned absence from the server on the part of North Line Manager darparniox, progress on the station stalled entirely until late August. The branch lines and port areas were completed in time for an opening on the 19th of September.

Gallery

gimme a sec

This page was last modified on 11 October 2022, at 09:49. (2 months ago)
Background Dragon Slayer - Retriever by Ironboundred