Green Coast Station

From Dogcraft Wiki

Green Coast Station
Survival 5 Akita
GCInfobox.png
Station
WorldSurvival 5 (Akita)
NetworkSurvival Railway Network (Survival 5)
LineAkita Ring Line
Opened27th September 2023
Builder(s)20.png Paulchen007
LocationX= 2980
Z= -1505
Connections Branch connections1


Green Coast Station was a station on the Akita world on Survival 5. The station was built by 20.png Paulchen007 at their base, and would make up a station on the Akita Ring Line as part of the Survival Railway Network. The station would open to the public on the 27th of September 2023 alongside Sunbeam Station and Northeast Station. These 3 stations would mark the final opening and activity of the SRN in Survival 5.

About The Station

Situated in a jungle biome, the station was fairly rustic in design, featuring stripped spruce framework with a moss block roof, with a small domed tower stretching out beyond that. The walls were predominantly made of andesite. The station itself was raised on a stilted platform, with all the redstone being located underneath. The stations interior was basic but functional, with a singular atrium containing 2 minecart terminals, with the walls adorned with network maps, maps of the area and bed benches for sleeping. Facilities like ender chests were also provided. A central bubble-vater took players upwards to the top of the elytra tower. An NTN portal was also found in the main atrium.

Situated next door to the station building was an RHN Shelter, featuring more intricate roofs made out of deepslate, but an overall similar aesthetic to the station. Ultimately due to Survival 5 ending shortly after its construction, the RHN would never make it to Paulchen007's base. Speaking of, the base was located approximately 100 blocks to the west of the station and shelter, which featured a similar rustic style with lush greens to reflect its jungle setting.

Green Coast Station was a part of the Akita Ring Line. It only had one completed connection, that being the one towards Northeast Station, the line of which was started by 20.png Montenator and completed in a Line Building session. Another connection was planned to head south towards Reservoir Station on the East Line, but due to the imminent end to Survival 5, this line was never completed, although it was started on the Reservoir Station end.

Gallery

Background Dragon Slayer - Retriever by Ironboundred