Aquarius Station

From Dogcraft Wiki

m (Text replacement - "Category:SRN" to "")
No edit summary
Tag: Visual edit
Line 21: Line 21:


[[Nova Station|'''Nova Station''']]
[[Nova Station|'''Nova Station''']]
'''[[Machair Station]]'''


==Gallery==
==Gallery==

Revision as of 10:03, 16 August 2021

Aquarius Station
Survival 4 Beagle
Aquarius Station.png
Aquarius Station at night.
Station
WorldSurvival 4 (Beagle)
NetworkSurvival 4 Beagle Railway Network
LineSouth Line
Opened29th May 2021
Builder(s)20.png Montenator 20.png N1cM4tth3w63
LocationX= -20
Y= 64
Z= 3000
ConnectionsMain-line connections2 


Aquarius Station is the second station on the Beagle South Line in Survival 4. The station was designed and built by 20.png Montenator and 20.png N1cM4tth3w63, while 20.png blueartistic813_ was responsible for the initial idea of the station. The station would open to the public on the 29th of May 2021 alongside Fir Station.

About

The station is located next to a large body of water, between a roofed forest and a plains biome. It is predominantly made of dark oak blocks, with a birch floor and a prismarine dome for the roof. The station also features a landscaped garden area around its vicinity. This includes a small roofed seating area and a large tree in the middle of a small bay to the right of the station. To the left of the station NTN access can be found, which was built into a purple fish.


The interior of the station has two levels, the first is the main station area which features a branch line terminal alongside the standard south line terminals. The first goes to South Station while the other goes towards Fir Station. Network maps and a map of the area surrounding the station are also present on this level. The second floor is much smaller but provides access to beds and other station amenities, such as ender chests and crafting tables. It can be accessed via a bubble-vator behind the map of the station. Players can return to the lower level by jumping onto the yellow carpets in the station, which have slime blocks underneath to cushion the fall.

South Line (Beagle)

Grand Central Station

South Station (Beagle)

Aquarius Station <-- You are here.

Fir Station

Nova Station

Machair Station

Gallery

This page was last modified on 16 August 2021, at 10:03. (9 months ago)
Background Takeshi by Edo