HQ Station, named so because the station houses the SRN HQ for the Survival 4 worlds, is the second connection on the Survival 4 Husky World for the West-Line.
HQ Station | |
---|---|
Survival 4 Husky | |
Station | |
World | Survival 4 (Husky) |
Network | Survival 4 Husky Railway Network |
Line | West Line |
Opened | 19 October 2020 |
Builder(s) | Skelleton123 |
Connections | 2 |
Map
Lua error in Module:ServerMap at line 83: attempt to concatenate upvalue 'zCoord' (a nil value).
|
Design
The first two things that you’ll notice when arriving at the station is it’s size and the massive locomotive displayed inside it.
The station is built up in different levels. In the basement we find the storage area for the HQ. It has all the needs for building stations and more. Using a theme of dark oak and stone textures the floor stands out in the yellow and cyan colors depicting the SRN-letters. Going up from there, using a brick and stone texture, the walls tower high up to house the massive locomotive representing the raillines the SRN stands for. On a smaller sublevel we find the stationplatforms. The two platforms face the same direction, much like they did on the West-Station for survival 3.
Above the stationplatforms we find several offices for the linemanagers. First there are 4 smaller offices provided for the Linemanagers on Beagle. On the upperfloor, below the roof we find the offices for the Linemanagers on the Husky world. All interiors are mostly constructed using dark oak and spruce.
The roofs are constructed using dark oak and dark prismarine blocks.
History
The SRN HQ was originally planned to be located close to Husky Spawn. After a lot of troubles with the permissions around the area were the building was supposed to come, it was decideded to have the station away from spawn. Thus came the idea to have it at the next West Station.
The first bricks were layed around the beginning of July 2020. It took Skelleton123 3 months to complete the structure for the station and the line. Almost 5 months after opening the first station on the line, this station was opened. But the station building is far from finished. As it serves as the HQ for the SRN, the building houses offices for linemanagers and a large storage area below. Small farms (woodfarms & sheep), a seperate building for Branchlines and more are still planned to be build over the coming months.
Station Facilities
The station provides an enderchest, crafting table, map of the local area and a netherportal connecting to the NTN. Further more the station has offices for linemanagers and the SRN HQ storage in the basement. There are no beds or elytra jump off provided at this time. Plans for both are included in the building that will also house the Branchline connections.