Connected Seas Coalition
From Dogcraft Wiki
mNo edit summary Tag: Visual edit |
Darparniox (talk | contribs) (update) |
||
Line 1: | Line 1: | ||
{{Infobox Project|title=Connected Seas Coalition|status=Active|contributors={{Player| | {{Infobox Project | ||
|title=Connected Seas Coalition | |||
|image= CSCdiscordlogo.png | |||
|status=Active | |||
|contributors={{Player|Montenator}} | |||
|leader={{Player|L1GHTN1NG_STR1KE}} | |||
|type=Water transport using boats | |||
|world= Akita<br>Corgi (planned)<br>Labrador (planned)<br>Shepherd (planned)}} | |||
==Origination== | ==Origination== | ||
The Connected Seas Coalition was the brainchild of the Knights of [[Calafort Úr]] | The Connected Seas Coalition (CSC) was the brainchild of the Knights of [[Calafort Úr]] during Survival 4. Inspired by the [[Survival Railway Network]], the knights aimed to reintroduce ocean travel as a viable transport option for players. The basic premise of the network is to provide infrastructure that facilitates water travel using boats. Ports link location by water, with lodestones and compasses used to navigate. Planned canals can be used for areas not easily traversed by natural water features. | ||
[[File:CSC Akita Spawn Port.png|thumb|''CSC Spawn Port on the Akita world'']] | |||
==Worlds== | ==Worlds== | ||
===Survival 4=== | ===Survival 4=== | ||
The conceptualisation of the CSC was fleshed out during 2020, in the Survival 4 period, although no known construction was completed. Consultation via a community survey was carried out prior to the launch of the [[Survival 5]] world in order to ascertain a more certain direction for the upcoming world. | |||
===Survival 5=== | ===Survival 5=== | ||
The | |||
The first port to be completed was the Akita Spawn Port in August 2022, by {{player|L1GHTN1NG_STR1KE}} and {{player|Montenator}}, and the first ceremonial voyage was between it and the port of [[South Station (Survival 5/ Akita)|South Station]]. | |||
__NOTOC__ | __NOTOC__ |
Revision as of 10:53, 31 August 2022
Connected Seas Coalition | |
---|---|
Project | |
Type | Water transport using boats |
World(s) | Akita Corgi (planned) Labrador (planned) Shepherd (planned) |
Leader(s) | L1GHTN1NG_STR1KE |
Contributors | Montenator |
Origination
The Connected Seas Coalition (CSC) was the brainchild of the Knights of Calafort Úr during Survival 4. Inspired by the Survival Railway Network, the knights aimed to reintroduce ocean travel as a viable transport option for players. The basic premise of the network is to provide infrastructure that facilitates water travel using boats. Ports link location by water, with lodestones and compasses used to navigate. Planned canals can be used for areas not easily traversed by natural water features.
Worlds
Survival 4
The conceptualisation of the CSC was fleshed out during 2020, in the Survival 4 period, although no known construction was completed. Consultation via a community survey was carried out prior to the launch of the Survival 5 world in order to ascertain a more certain direction for the upcoming world.
Survival 5
The first port to be completed was the Akita Spawn Port in August 2022, by L1GHTN1NG_STR1KE and Montenator, and the first ceremonial voyage was between it and the port of South Station.