Written by Dogcraft Transport Discord     18.04.2024

Transport Newsletter: April 24

From Dogcraft Wiki

Revision as of 16:08, 18 April 2024 by Tyrantrumgod (talk | contribs) (Made the newsletter)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
https://dogcraft.net/wiki/images/a/a7/DTD-Newsletter.png

TEMPLATE: News header (this line is only visible in editing)


NTN Updates

The NTN has had good progress made in the last month on the inner ring tunnels. We’d like to ask for a few material donations! The main materials needed currently are ice, smooth sandstone, mudbricks and dripstone. Additionally, spruce logs and sand would be useful. Donations can be made at the NTN HQ. Thanks so much for your continued support!

The NTN Donation Center and NTN HQ Station at sunset.png

SRN Updates

Work continues on all the main lines this month. Retriever East has made great progress thanks to 5MileSmile! Minda905 has also continued work on Retriever West and started planning the line between it and GCS. Darparniox has also been making steady progress on Rettie North. On Sheltie, Skelleton123 continues to make good progress in the Sheltie West Station area, with a CSC Port and RHN Shelter being built recently. Banner Station on the Sheltie South Line continues to be worked on by Chemi. Finally, there are currently 2 open Station build tasks in the open tasks portion of this Discord, please reach out if you want to make a station!

SRN-Vectorized-Logo.png

RHN Updates

There hasn’t been much progress since last month due to Tyr and Shako being gone for a bit due to IRL stuff, but luckily Xambaka has taken charge and done some stuff. On Retriever, a new road has come and it is called Frostbreach Road. While on Sheltie, Canine Highway has popped up. This is a road from Canine Kingdom going to East Station. Speaking of Sheltie, the roads going from Spawn have finally gotten names! ATM, no signage is up, but for Sheltie Boulevard there is. More signage is coming soon. In the latest days, Shako has returned and done a lot of work on Retriever. The current plans feature connecting roads to actual spawn in some shape and form. Lastly, on Saturday, April 20th, RHN will host its first-ever building session! This is happening on Sheltie, and shouldn’t take long. Bring your shovels and pickaxes!

RHN Build Session April 20 2024.jpg

CSC Updates

The CSC has been continuing to work on connecting dogcraft by water! This month we published new standardised designs for buoys, as well as the brand new CSC signposts! Signposts are used instead of buoys in rivers, canals and at the shore and help players navigate the waterways to nearby ports and points of interest! We are now going to install these signposts all over the server and ask the community to help out. If you have a river ocean near your base, or just generally want to help out, consider placing some CSC signposts or building some buoys! You can find the designs on the CSC’s wiki page.We are also working on building further ports and canals, so stay tuned for more CSC events in the future!

CSC Standard Buoy Design.png
Background Takeshi by Edo