Shoreline Station

From Dogcraft Wiki

imported>DarparnioxDC
(Adding categories)
imported>DarparnioxDC
No edit summary
Line 1: Line 1:
{{Infobox_Station|title1 = Shoreline Station|location = x: -8, z: -2431|network(s) = SRN, NTN|line = North Line|builder = darparniox|opened = 9แต—สฐ January 2019|main_lines = 2|secondary_lines = 1}}'''Shoreline Station''' is the second station of the North line of the Survival 3 [[Survival Railway Network|SRN]] and follows on from North Station. Predictably, the station is situated on the shore of a large ocean, which is not bridged until the site of the third northern station, Witchwood Station.
{{Infobox_Station|title1 = Shoreline Station|location = x: -8, z: -2431|network(s) = SRN, NTN|line = North Line|builder = darparniox|opened = 9แต—สฐ January 2019|main_lines = 2|secondary_lines = 1|image1 = 2019-03-06 20.28.32.png}}'''Shoreline Station''' is the second station of the North line of the Survival 3 [[Survival Railway Network|SRN]] and follows on from North Station. Predictably, the station is situated on the shore of a large ocean, which is not bridged until the site of the third northern station, Witchwood Station.


== Design ==
== Design ==

Revision as of 07:36, 6 March 2019

Shoreline Station
Station
World[[]]
Network[[Survival Railway Network ({{{world}}})]]
LineNorth Line
Opened9แต—สฐ January 2019
Connections 

Shoreline Station is the second station of the North line of the Survival 3 SRN and follows on from North Station. Predictably, the station is situated on the shore of a large ocean, which is not bridged until the site of the third northern station, Witchwood Station.

Design

Shoreline Station features two platforms, both topped with large slanted roofs. These platforms are used for SRN lines and branch lines, respectively. A large tower adorns the East side of the station, and houses a NTN portal and can be used to access the roof for elytra flight.

Sandstone and wood variants are the main materials used, with prismarine as an accent.

History

The rail line toward Shoreline Station from North Station was completed in a single day. This quick expansion left the North Line in a advanced state, and therefore other tasks were given priority over the station construction.

Nevertheless, Shoreline Station was the earliest second stop to be completed in early January 2019. Two weeks later, a branch line to Dragon Valley was built and connected to the station, albeit among some confusion as to the correct platform for it.

This page was last modified on 6 March 2019, at 07:36. (14 months ago)
Background Valentine's Day Event 2024 by TheWhiteTigerNL