SRN/NTN UpdateIts been a little while since an update has been published, and a lot has happened! Without further ado...
- The line from Pyramid Station to the under construction Swamp Station on the east line has been built by Aeghu.
- Swamp Nether Station has been built to complement the rail station. It was built by edo and OPwrecker.
- The line from Mesa Station to the also under construction Soms Station has (finally) been completed by me.
- A new secondary railway to Tyrage's Spirit Town has been built by OPwrecker with help from Aeghu. The station has also been built with a connection to the main east NTN line there too.
- Major work has been done on the south line from South Station by OPwrecker, edo, FredRaket, Aeghu, Wietselubbers and myself. This line has come along very quickly and its been a big effort from all involved. And yep, that station is under construction too
- Brianetta has completed the line from his base to SummerFlower's, creating Green House and Summer Ravines Station in the process. This is the longest singular line in the entire network! The line is operating as a secondary one for now until the main SRN reaches the area that it is in.
As such, the map has been updated (open image in a new tab to make bigger)
Individual builders will post more stuff on their specific lines in this thread. Posts such as this one will be made every month or so to summarize and update the map.
To avoid double posting, heres some pictures of the Mesa to Soms line